For a loft conversion or room in the roof, the insulation goes along the slope: between the rafters and often a layer underneath. How thick does it need to be for Part L, what do the rafters cost, and what happens without a vapour control layer?
Open the free calculator →Calculate U-value, condensation and summer performance instantly – free, no accountWorked example
Rafters 47 mm wide at 400 mm centres, breathable roofing membrane, tiles on battens. Inside: plasterboard, with or without a layer of insulation under the rafters (as insulated plasterboard or boards plus plasterboard).
| Build-up | U (W/m²K) | Part L (0.16) |
|---|---|---|
| 100 mm PIR between the rafters | 0.30 | no |
| 100 mm PIR between + 25 mm PIR under | 0.21 | no |
| 100 mm PIR between + 50 mm PIR under | 0.17 | almost |
| 100 mm PIR between + 60 mm PIR under | 0.16 | yes |
| 150 mm glass wool between + vapour control layer | 0.28 | no |
| 150 mm glass wool between + VCL + 50 mm PIR under | 0.17 | almost |
PIR λ 0.022, glass wool λ 0.035. Tiles and battens do not count: the calculation stops at the ventilated layer.
Open this example in the calculator →
The rafters cost about a fifth
Timber conducts heat about four times better than glass wool. Calculate the 150 mm of glass wool as if there were no rafters and you get U 0.22. With rafters at 400 mm centres it is 0.28: about 22 % worse, although the timber is only 12 % of the area. A continuous layer under (or over) the rafters covers the timber and wins most of that back. That is why the layer under the rafters helps so much.
Vapour control: not optional
Leave out the vapour control layer in the glass wool roof and the Glaser method (DIN 4108-3) finds about 4.5 kg of condensation per m² each winter against the roofing membrane. The limit there is 0.5 kg/m². With a vapour control layer of sd 10 m there is none.
- Foil-faced PIR boards act as a vapour control layer when all joints are taped. The calculator finds no condensation, but almost no drying capacity either: moisture that gets in through an untaped joint can hardly get out. Tape carefully.
- Run cables and sockets in a service void on the warm side of the vapour control layer.
- With an old non-breathable sarking felt, keep a 50 mm ventilated gap above the insulation, or calculate the roof with the real felt.
What Part L asks for (England)
- Converting or renovating an existing roof: if the roof is worse than U 0.35 and you renovate more than half of it, aim for 0.16 (Approved Document L vol. 1, table 4.3). If that would limit headroom too much, a lesser standard is acceptable, provided the insulation fills at least the depth of the rafters and you choose the insulant with the lowest practicable U-value.
- New roof on an existing home (extension): 0.15 (table 4.2).
Sleeping under the roof? Also look at the phase shift: it decides how hot the room gets in summer. PIR is light and gives little delay.
In the calculator choose Pitched roof. For the layer with rafters tick Inhomogeneous layer and enter the rafter width and spacing. The moisture check shows straight away whether your vapour control is sufficient.
Isolator is a free, independent alternative to established building-physics calculators such as Ubakus: build your wall, roof or floor layer by layer and instantly see the U-value, condensation risk and summer performance – no account, right in your browser. What sets Isolator apart: compare variants side by side to see which build-up performs best, check them straight against building regulations and calculate with the λ-values that apply in your country.